News

Replacement of Isothermal Nitration by Adia-batic one

For our client M/s BorsedChem MCHZ, s.r.o. the company prepared the documentation for the large-range Project of “Replacing isothermal nitration with adiabatic”. After commissioning of adiabatic benzene nitration, where HUTNÍ PROJEKT Frýdek-Místek a.s. processed off-site serving to ensure higher production capacities for individual media, there was also an increasement in the production of nitrobenzene respective…

Commissioning of the coke oven technology in India

The team of HUTNÍ PROJEKT Frýdek-Místek a.s. and HUTNI PROJEKT FM (INDIA) PRIVATE LIMITED succeeded in commissioning of the coke oven technology in the first of two new large-scale coke oven batteries for the client NMDC, Nagarnar, India. In these days, individual operational units of chemical plant such as tar or naphthalene production, H2S washing…

HUTNÍ PROJEKT Frýdek-Místek a.s. is breaking through in the Japanese market

HUTNÍ PROJEKT Frýdek-Místek a.s. in the past established contact with the Japanese company MEGATECH CORORATION with the intention of cooperating in the sale and installation of Pilot Coke Ovens on local market. As result of this cooperation now become the signing of the contract for the processing of the Pilot Coke Oven project “Basic engineering…

WE ARE LAUNCHING A MAJOR PARTNERSHIP IN THE FIELD OF HYDROGEN TECHNOLOGIES

With optimism and good feeling we announce the start of cooperation with company HYDROGEN SYSTEMS s.r.o., which we will jointly operate in the rapidly developing market of hydrogen technologies. As we are fully aware of the challenges that these new technologies bring, we see this step as a clear signal to our potential partners and…

New contract

HUTNÍ PROJEKT Frýdek-Místek a.s. was successful in the tender for a turnkey delivery of the “New Air Compressor” for the company Liberty Ostrava a.s. The supply and installation of the required technology includes the replacement of the existing steam air compressor with 3 new modern screw air compressors. The delivery also includes preparatory and design…

Optimization of the Quenching Tower

The company has signed a contract for the making of Design documentation for the company AZOVSTAL in Ukraine. Its subject is the optimization of the Quenching Tower using of HUTNI PROJEKT Frydek-Mistek know-how and patented built-in insert with high cooling efficiency and at the same time with minimal impact on the environment.

Visit to the Czech Embassy in Delhi

Director of HUTNI PROJEKT FM (INDIA) Mr Chetan Sangani has visited Czech Embassy in Delhi where a meeting with Joint Ministry of Steel and Czech Ambassador has occur. The post is in this link. 

New contract

Company HUTNÍ PROJEKT Frýdek-Místek a.s. in a consortium with the Polish company ZK-REM Sp. z o.o., won the Turnkey Project in Pland Cokery, for Regeneration of solutions and Treatment of waste coke oven gas by ammoniacal desulphurisation. The contract was signed on July 30, 2020 and its implementation shall be 28 months.

Next step in Nagarnar (India) BPP project

In the Indian state of Chhattisgasgarh, the greenfield Site Complex of Nagarnar is under construction for a new steel complex with annual  capacity of 3 million tons of steel, including two large-volume coke oven batteries with the complete chemical part (BPP) of the coking plant. HUTNÍ PROJEKT Frýdek-Místek is together with its Indian consortional partners…

Completion of the 1st stage of the modernization

HUTNÍ PROJEKT Frýdek-Místek a.s. completed the first stage of modernization of the quenching tower, in Kosice in Slovakia republic recently. The second stage will be realized during next year. The first stage consisted of the construction of a temporary quenching tower to modernize the old, inadequate quenching tower which does not meet the nowadays´ emission…

New project

After successful tender stage, HUTNÍ PROJEKT Frýdek-Místek, a.s. has concluded Contract with ArcelorMittal Ostrava a.s. for a project „Deacidifier and Stripper at Coke plant“. Within the project there will be installed two new apparatuses (Deacidifier and Stripper). This is a replacement of existing apparatuses with a view to ensure the operation of existing equipment. There will…

Completion of Basic Engineering

HPFM is leading Consortium in the Design and Construction of Coke Chemicals for Coke Battery No. 5 at RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT. In accordance with the contract signed on October 14, 2017, HPFM completed basic engineering within eight months of signing the contract. Currently the work on engineering details is being conducted…

65TH ANNIVERSARY CELEBRATION

These days we are celebrating 65 successful years of joint-stock company HUTNÍ PROJEKT FRÝDEK – MÍSTEK a.s. with the realization of hundreds of industrial, transport, civil and energy buildings. The existence of this company in such a complex market is mainly the merit of all the employees who have gone through this company. Everyone contributed…

HUTNÍ PROJEKT Frýdek-Místek Concluded Another Contract in India

On 14 October 2017, HUTNÍ PROJEKT Frýdek Místek a.s. signed a contract for the supply of chemical operations of the coking plant with Vishakhapatnam Steel Plant in India with the aim to expand the existing coke production by means of a coke oven battery No. 5 with a total annual production capacity of 7.3 million…

Commissioning of Pilot Oven

In the company TŘINECKÉ ŽELEZÁRNY a.s. a pilot coke oven, which was designed, delivered and commissioned by the general contractor of the HUTNÍ PROJEKT Frýdek-Místek a.s. company on 20.7.2017. The experimental coke oven serves to measure the expansion pressure of coal and other physical quantities necessary for the correct composition of the coal charge into…

Drying and heating of the coke oven battery No. 11

Company HUTNÍ PROJEKT Frýdek-Místek a.s. carried out after modernization drying and heating of the coke oven battery No. 11, in TŘINECKÉ ŽELEZÁRNY, a. s. in the term from 12.7.2016 till 26.9.2016. A unique wireless data collection technology has been used for the first time, which is now available for other projects. This technology is characterized…

“Coal and Coke & Risk” conference in Moscow

HUTNI PROJEKT Frydek – Mistek a.s. under the association of MMI-PRO has its speaker in conference held in Moscow on 06 – 07 10.2016. We presented in this conference a solution for worth quality of coking coal based on stamp charge technology of battery charging. With other presenters we became familiar with the problems in…