Modernization of the ammonium sulphate belt conveyer and centrifuge

Category: Coke Procuction Location: Ostrava Implementation: 2022 Description: For our investor, we have completed the Modernization of the Ammonium Sulphate belt conveyer and the centrifuge. The purpose of the construction was to modernize the ammonium sulfate conveyer belt consisting of  the replacement of the conveyor belt and the existing unsatisfactory Centrifuge. The compensation also covered the…

Experimental pilot coke oven, Dillingen

Category: Coke Procuction Location: Germany, Dillingen Implementation: 2022 Description: HUTNÍ PROJEKT Frýdek-Místek a.s. supplies and installs at the SHS SERVICES GmbH plant in Dillingen Saar, Germany the pilot oven. This  device is designed for process of testing 500kg of coal in pilot oven including coal preparation, coke quenching and coke stabilization. Parameters of pilot oven The coke…

Modernization of Quenching tower

Category: Coke Procuction Location: Slovak Republic Implementation: 2019   Description: HUTNÍ PROJEKT Frýdek-Místek a.s. has completed modernization of Quenching tower for large volume COB with annual capacity of 1 mil t coke.  The aim of the project was to reduce emissions of solids during coke quenching.  The modernization consisted in the installation of a secondary quenching…

Sole Heated Oven (SHO)

Category: Coke Procuction Location: Germany Client:ThyssenKrupp Steel Europe AG Implementation: 2019   Description: HUTNÍ PROJEKT Frýdek-Místek a.s. supplied and installed at the ThyssenKrupp Steel Europe AG plant in Duisburg the SHO test furnace for measuring of expansion of coking coals. The supplied SHO furnace is a result of the company’s own development and is manufactured in…

Unattended and automated operation of quenching car and ramps

Category: Coke Procuction Location: Třinec Client: Třinecké železárny a.s. Implementation: 2018   Description: HUTNÍ PROJEKT Frýdek-Místek a.s. has designed and implemented a new wet quenching of coke in a quenching tower. The existing system did not allow a uniform quenching of coke on a quenching car. New system was developed to improve coke cooling, consisting of spraying nozzles…

The first stage of modernization of the quenching tower

Category: Coke Location: Košice, Slovak Republic  Implementation: 2018   Description: HUTNÍ PROJEKT Frýdek-Místek a.s. completed the first stage of modernization of the quenching tower, in Kosice in Slovakia republic recently. The second stage will be realized during next year. The first stage consisted of the construction of a temporary quenching tower to modernize the old, inadequate quenching tower which…

Replacement of the collector mains

Category: Coke Location: Košice, Slovak Republic  Implementation: 2018   Description: Next stage of the replacement of the collector mains on the large-volume coke oven battery block has been realized by reason of unsatisfactory condition of existing facilities. During the reconstruction, the collecting mains were replaced on one block of the battery. The project has been realized during the full…

Design and Construction of Coke Battery

Category: Coke Location: VISAKHAPATNAM , India Implementation: in a progress Description: HPFM is  leading Consortium in the Design and Construction of Coke Chemicals for Coke Battery No. 5 at RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT. In accordance with the contract signed on October 14, 2017, HPFM completed basic engineering within eight months of signing the SoD. Currently…