Production of coke – Quenching tower COB No 7&8
Category: Coke Location: Ostrava – Přívoz, Coke plant Svoboda Tenderer: OKK Koksovny a.s. Realization: 2014 Description: Kind of quenching: Low emission technology(LECQ)
Category: Coke Location: Ostrava – Přívoz, Coke plant Svoboda Tenderer: OKK Koksovny a.s. Realization: 2014 Description: Kind of quenching: Low emission technology(LECQ)
Category: Energy Location: Ostrava Sponsor: Veolia Energy Czech Republic, a.s. Type of construction: New Installation Implementation: 2014 Description: The modernization of electricity production and increasing of the environmental equipment designed to reduce emissions of SO2, NOx and particulate matter and ash disposal.
Category: Coke Location: Darkhan, Mongolia Tenderer: SHARYNGOL ENERGY LLC Realization: 2014 Description: HUTNÍ PROJECT Frydek-Mistek a.s. processed study for the construction of heat recovery coke ovens.
Location: Ostrava, Koksovna Svoboda Customer: OKK Koksovny a.s. Realization: 2013 Description: It was a complete supply of a new vehicle of the transfer from design through manufacturing, assembly, testing, and handed to customer. This delivery was realized by our partner DALSELV DESIGN a.s.
Location: Třinec Customer: Třinecké Železárny, a.s. Realization: 2013 Description: For the outsourcer our partner was DALSELV DESIGN a.s., a study involving maximum environmental measure and increase machine performance.
Category: Machinery Location: Ostrava, Koksovna Svoboda Customer: OKK Koksovny a.s. Implementation: 2012 – 2013 Description: There was a reconstruction of changing device COB 7 and COB 8 of changing with the installation of hydraulic winches and installing of new mini-ascension incl. water management on COB 8 to improve environmental and working conditions on the ceiling…
Category: Chemical plants Location: Ostrava Client: ArcelorMittal Ostrava Inc. Type of construction: Reconstruction and modernization Realization: 2012 Description: The main meaning of this project was to adjustment of existing buildings were to the desulphurization of coke oven gas to achieve process optimization, especially through the construction of a new final gas coolers and ensuring…
Category: Coke Location: Kosice Tenderer: Zelezarny Kosice, Slovak Republic Realization: 2011 Description: The target of Pad-up revamping of COB 3 was the replacement of masonry coke oven battery in the range of 6-heating walls while maintaining the follow-up of technological components in the original design. Pad-up revamping was made for the operation of the remaining…
Location: Radlin, Poland Sponsor: Kombinat Koksochemiczny „Zabrze” S.A. Realization: 2011 Description: As in context of environmental measures have our partner DALSELV DESIGN a.s. delivered, installed and put into oven machine parts of coke oven batteries with stamping operation.
Category: Coke Location: Ostrava Tenderer: OKK, a.s. Realization: 2010 Description: HUTNI PROJEKT Frydek-Mistek a.s. carry out about repair and revamping of COB 10 for a Tenderer to “turnkey”, including project.
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful. More about personal data protection.
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.