Reduction of Fugitive Emissions of Solid Polluting Substances on Departure Routes of the northern part of Sinter in AMO

Category: Industry Location: Ostrava Client: Liberty Ostrava a.s. Implementation: 2022 Description:  Our company successfully completed a turnkey delivery, the subject of which was the reduction of fugitive emissions of solid pollutants substances on the departure routes of northern part of Sinter Plant. Part of the project was the design of a new optimized exhaust duct network…

Industrial buildings – New manufacturing plant for Medical Sets

Category: Industrial Buildings Location: Havířov Type of construction: New Realization: 2017 Description: The construction of a “New manufacturing plant for Medical Sets” was statutory approved for the investor Mölnlycke Health Care ProcedurePak s.r.o., In May 2017. The operation is specialized on the production of disposable surgical Mölnlycke Procedure sets at the factory. Our company HUTNÍ PROJEKT Frýdek-Místek a.s. was…

Industrial buildings: De-dusting system of charging blast furnace 2 and 4

Category: Industrial Buildings Location: Ostrava Customer: ArcelorMittal Ostrava, Inc. Type of construction: New Realization: 2015 Description: The project´s aim was reduction of fugitive emissions from the Blast furnace charging system 2 and 4 – That was done by replacing of the existing electrostatic precipitators for fabric filters and the entire replacement and revamping of the…

Industrial facilities – Decreasing of fugitive emissions

Category: Industrial Buildings Location: Ostrava Customer: ArcelorMittal Ostrava, Inc. Type of construction: New Installation Realization: 2014-2015 Description: During the erection was the existing de-dusting system dismounted. They were built two new filtration plant including new chimneys, switching station, compressor station. There was installed new de-dusting duct for all the technological equipment and the cooling belts.…

Industrial buildings – Coromodora – New production plant

Category: Industrial Buildings Location: Mošnov Customer: CROMODORA WHELLS s.r.o. Type of construction: New Realization: 2007 Description: The new production hall was built in the Mošnov industrial zone. HUTNÍ  PROJEKT Frýdek-Místek a.s., as a main designer, has processed a complex project including landscaping the hall with all installations, air conditioning for the hall and technology, communication and weighbridge.