Modernization of the deamonization station and lye storage tanks at the ammonia plant

Category: Chemical plants Location: Ostrava Sponsor: OKK Koksovny Ostrava a.s., Czech Republic Scope of work: turnkey delivery Term: 2023 Description: Our company completed the turnkey delivery of the “Modernization of the deamonization station and lye storage tanks at the ammonia plant” of OKK Koksovny, a.s. As part of the modernization, 2 tanks for sodium hydroxide were replaced,…

Reconstruction of gas exhauster drives

Category: Energy Type of construction: Permanent construction Localization: Ostrava Client: OKK Koksovny a.s. Implementation: 2023 Description: Our company has completed a delivery to replace the existing ring electric motors of the TK1 and TK2 turbochargers with new asynchronous motors with start-up and speed controlled by frequency converters. This replacement resulted in energy savings in the…

KRAIC INSTALLATION

Category: Chemical plants Location: Radlin, Poland Sponsor: JSW KOKS SPÓŁKA AKCYJNA Term: 2022 Description: HUTNÍ PROJEKT Frýdek-Místek a.s. completed the Desulfurization project for JSW RADLIN, Poland. Amount of coke oven gas: 45,000 Nm3/h (including approx. 5,000 Nm3/h post-reaction gas from the catalytic decomposition of ammonia and Claus sulfur production. – “KRAiC”.

Reduction of Fugitive Emissions of Solid Polluting Substances on Departure Routes of the northern part of Sinter in AMO

Category: Industry Location: Ostrava Client: Liberty Ostrava a.s. Implementation: 2022 Description:  Our company successfully completed a turnkey delivery, the subject of which was the reduction of fugitive emissions of solid pollutants substances on the departure routes of northern part of Sinter Plant. Part of the project was the design of a new optimized exhaust duct network…

New Air Compressor

Category: Energy Type of construction: Permanent construction Localization: Ostrava Client: Liberty Ostrava a.s. Implementation: 2022 Description: HUTNÍ PROJEKT Frýdek-Místek a.s. the turnkey delivery of the “New Air Compressor” was completed for Liberty Ostrava a.s. Part of the delivery and installation of the required technology was the replacement of the existing steam air compressor with 3…

Modernization of the ammonium sulphate belt conveyer and centrifuge

Category: Coke Procuction Location: Ostrava Implementation: 2022 Description: For our investor, we have completed the Modernization of the Ammonium Sulphate belt conveyer and the centrifuge. The purpose of the construction was to modernize the ammonium sulfate conveyer belt consisting of  the replacement of the conveyor belt and the existing unsatisfactory Centrifuge. The compensation also covered the…

Modernization of gas distribution for tubular oven

Category: Coke Procuction Location: Ostrava Implementation: 2021 Description: Our company successfully completed the delivery of the project “Modernization of gas distribution for tubular oven” for OKK Koksovny a.s.  The purpose of the project was to modernize the coke oven gas distribution in three stages for the purpose of heating of tubular ovens 31a and 31b intended…

Experimental pilot coke oven, Dillingen

Category: Coke Procuction Location: Germany, Dillingen Implementation: 2022 Description: HUTNÍ PROJEKT Frýdek-Místek a.s. supplies and installs at the SHS SERVICES GmbH plant in Dillingen Saar, Germany the pilot oven. This  device is designed for process of testing 500kg of coal in pilot oven including coal preparation, coke quenching and coke stabilization. Parameters of pilot oven The coke…

Modernization of Quenching tower

Category: Coke Procuction Location: Slovak Republic Implementation: 2019   Description: HUTNÍ PROJEKT Frýdek-Místek a.s. has completed modernization of Quenching tower for large volume COB with annual capacity of 1 mil t coke.  The aim of the project was to reduce emissions of solids during coke quenching.  The modernization consisted in the installation of a secondary quenching…

Replacement of collecting mains of large volume COB

Category: Coke Procuction Location: Slovak Republic Implementation: 2019   Description: In the end of the year HUTNÍ PROJEKT Frýdek-Místek a.s. executed the replacement of collecting mains on last of three blocks of large volume COB with annual capacity 1 mil t coke. As a part of the works there were dismantled both old worn out collecting…

Sole Heated Oven (SHO)

Category: Coke Procuction Location: Germany Client:ThyssenKrupp Steel Europe AG Implementation: 2019   Description: HUTNÍ PROJEKT Frýdek-Místek a.s. supplied and installed at the ThyssenKrupp Steel Europe AG plant in Duisburg the SHO test furnace for measuring of expansion of coking coals. The supplied SHO furnace is a result of the company’s own development and is manufactured in…

Modernizing of Saturator 1A at ammonia plant

Category: Chemical plants Location: Ostrava Sponsor: OKK Koksovny Ostrava a.s., Czech Republic Scope of work: Modernizing of Saturator 1A at ammonia plant Building type/purpose: Reconstruction Term: 2019 Description: HUTNÍ PROJEKT Frýdek-Místek, a.s. has finished upgrading of Saturator 1A at Ammonia plant in Coke oven plant Svoboda. Modernization of Saturator 1A consisted of disassembly and complete replacement of the lower…