Coke battery – Modernization of quenching towers of coke oven battery no. 1

Category: Coke oven battery Location: Ostrava Customer: ArcelorMittal Ostrava Inc. Project: Modernization of existing Quenching tower Realization: 2015 Description: Project consisted in modernization and upgrade of existing technological equipment for wet quenching of coke in order to reduce dust emissions during coke quenching. Turn-key delivery solved a significant reduction of dust emissions from quenching tower. …

Chemical plants – Chemical plants including chilled water plant

Category: By-Product Location: India Tenderer: Steel Authority of India LTD. Rourkela Steel Plant Type of construction: New Installation Implementation: Partly Running Description: This is the construction of by-product including water system and chilled water system plants. Finishing of commissioning and guaranty tests of some parts of technology occurred in last year (2015) in Rourkela Steel…

Chemical plants – Desulphurization of raw coke oven gas

Category: By-Product Location: Kosice, Slovak Republic Client: Iron Kosice Type of construction: Environmental facility Realization: 2010   Description: HUTNI PROJEKT Frydek-Mistek a.s. was the general contractor of this facility. The main aspect of this project was desulphurization and eliminating ammonia from raw coke oven gas by “ammonia method”, production of liquid sulfur from hydrogen-sulphide generated…

Chemical plants – Flare for coke oven gas (emergency combustion of gas)

Category: Industrial Buildings Location: Kraków, Poland Client: ArcelorMittal Poland with. A. Type of construction: New Installation Realization: 2015 Description: The project dealt with the installation for emergency coke oven gas combustion at ArcelorMittal in Krakow. Combustion will take place, as needed, depending on the gas pressure in the network coke oven. Emergency system consists of…

Production of coke – Repair walls of coke oven No. 7

Category: Coke Location: Ostrava – Přívoz, Coke plant Svoboda Tenderer: OKK Koksovny a.s. Realization: 2015-2017   Description: Company HUTNÍ PROJEKT Frýdek-Místek a.s. has carried out the services by the Thermo Technical department. Repaired part of the coke-oven refractories has been cooled, thermal regime was kept during disassemly and brickworks, followed by regulation of repaired part.

Industrial buildings: De-dusting system of charging blast furnace 2 and 4

Category: Industrial Buildings Location: Ostrava Customer: ArcelorMittal Ostrava, Inc. Type of construction: New Realization: 2015 Description: The project´s aim was reduction of fugitive emissions from the Blast furnace charging system 2 and 4 – That was done by replacing of the existing electrostatic precipitators for fabric filters and the entire replacement and revamping of the…

Industrial facilities – Decreasing of fugitive emissions

Category: Industrial Buildings Location: Ostrava Customer: ArcelorMittal Ostrava, Inc. Type of construction: New Installation Realization: 2014-2015 Description: During the erection was the existing de-dusting system dismounted. They were built two new filtration plant including new chimneys, switching station, compressor station. There was installed new de-dusting duct for all the technological equipment and the cooling belts.…