Modernization of the deamonization station and lye storage tanks at the ammonia plant

Category: Chemical plants Location: Ostrava Sponsor: OKK Koksovny Ostrava a.s., Czech Republic Scope of work: turnkey delivery Term: 2023 Description: Our company completed the turnkey delivery of the “Modernization of the deamonization station and lye storage tanks at the ammonia plant” of OKK Koksovny, a.s. As part of the modernization, 2 tanks for sodium hydroxide were replaced,…

Replacement of Isothermal Nitration by Adia-batic one

For our client M/s BorsedChem MCHZ, s.r.o. the company prepared the documentation for the large-range Project of “Replacing isothermal nitration with adiabatic”. After commissioning of adiabatic benzene nitration, where HUTNÍ PROJEKT Frýdek-Místek a.s. processed off-site serving to ensure higher production capacities for individual media, there was also an increasement in the production of nitrobenzene respective…

Reconstruction of gas exhauster drives

Category: Energy Type of construction: Permanent construction Localization: Ostrava Client: OKK Koksovny a.s. Implementation: 2023 Description: Our company has completed a delivery to replace the existing ring electric motors of the TK1 and TK2 turbochargers with new asynchronous motors with start-up and speed controlled by frequency converters. This replacement resulted in energy savings in the…

KRAIC INSTALLATION

Category: Chemical plants Location: Radlin, Poland Sponsor: JSW KOKS SPÓŁKA AKCYJNA Term: 2022 Description: HUTNÍ PROJEKT Frýdek-Místek a.s. completed the Desulfurization project for JSW RADLIN, Poland. Amount of coke oven gas: 45,000 Nm3/h (including approx. 5,000 Nm3/h post-reaction gas from the catalytic decomposition of ammonia and Claus sulfur production. – “KRAiC”.

Reduction of Fugitive Emissions of Solid Polluting Substances on Departure Routes of the northern part of Sinter in AMO

Category: Industry Location: Ostrava Client: Liberty Ostrava a.s. Implementation: 2022 Description:  Our company successfully completed a turnkey delivery, the subject of which was the reduction of fugitive emissions of solid pollutants substances on the departure routes of northern part of Sinter Plant. Part of the project was the design of a new optimized exhaust duct network…

New Air Compressor

Category: Energy Type of construction: Permanent construction Localization: Ostrava Client: Liberty Ostrava a.s. Implementation: 2022 Description: HUTNÍ PROJEKT Frýdek-Místek a.s. the turnkey delivery of the “New Air Compressor” was completed for Liberty Ostrava a.s. Part of the delivery and installation of the required technology was the replacement of the existing steam air compressor with 3…