Replacement of the collector mains

Category: Coke Location: Košice, Slovak Republic  Implementation: 2018   Description: Next stage of the replacement of the collector mains on the large-volume coke oven battery block has been realized by reason of unsatisfactory condition of existing facilities. During the reconstruction, the collecting mains were replaced on one block of the battery. The project has been realized during the full…

New project

After successful tender stage, HUTNÍ PROJEKT Frýdek-Místek, a.s. has concluded Contract with ArcelorMittal Ostrava a.s. for a project „Deacidifier and Stripper at Coke plant“. Within the project there will be installed two new apparatuses (Deacidifier and Stripper). This is a replacement of existing apparatuses with a view to ensure the operation of existing equipment. There will…

Chemical plants – Trays of NaOH

Category: Chemical plants Location: Ostrava Sponsor: BorsodChem MCHZ, s.r.o. Scope of work: turnkey project Building type/purpose: reconstruction Term: in progress Description: This is the dismantling of two pieces of existing containers and their disposal. The delivery includes the installation of new 4% NaOH H 1207 A, B solution onto the loose shafts.

Energy – Greening of boilers K12, K13, K14 of Třebovice Power Station

Category: Energy Type of construction: New Installation Localization: Ostrava – Třebovice Client: NOEN, a.s Implementation: 2017 Description: For the energy industry, our company developed for Veolia Energie ČR, a.s. project documentation for the execution of the construction, including the execution of the function of the general designer for the complete project documentation for the project entitled “The…

Design and Construction of Coke Battery

Category: Coke Location: VISAKHAPATNAM , India Implementation: in a progress Description: HPFM is  leading Consortium in the Design and Construction of Coke Chemicals for Coke Battery No. 5 at RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT. In accordance with the contract signed on October 14, 2017, HPFM completed basic engineering within eight months of signing the SoD. Currently…

Completion of Basic Engineering

HPFM is leading Consortium in the Design and Construction of Coke Chemicals for Coke Battery No. 5 at RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT. In accordance with the contract signed on October 14, 2017, HPFM completed basic engineering within eight months of signing the contract. Currently the work on engineering details is being conducted…

65TH ANNIVERSARY CELEBRATION

These days we are celebrating 65 successful years of joint-stock company HUTNÍ PROJEKT FRÝDEK – MÍSTEK a.s. with the realization of hundreds of industrial, transport, civil and energy buildings. The existence of this company in such a complex market is mainly the merit of all the employees who have gone through this company. Everyone contributed…

Coke production – Replacement of collecting headers on coke oven battery with 7m height

Category: Coke Location: Košice, Slovak Republic  Implementation: 2017 Description: The replacement of extraction headers including accessories has been realized by reason of unsatisfactory condition of existing facilities. COB block headers have been replaced during the construction time including pipeline system, wiring system, control system and standpipes re-walling. The project has been realized during full operation of neighbor…