Company History & Profile

HUTNI PROJEKT Frydek-Mistek a.s. – PROJECT OF YOUR SUCCESS

HUTNI PROJEKT Frydek-Mistek a.s. It is a private engineering-supply company with a strong engineering background, which was founded in the fifties of the twentieth century and ranks among the front leading Czech engineering-supply organization today.

Our company has influence to the level of Czech and world metallurgical coke and metallurgical chemistry. HUTNI PROJEKT Frydek-Mistek a.s. is known at international markets as a major export company of complete investment units and technological equipment. Its activities also extends to related fields such as engineering, energy, gas, water and hot water distribution, wastewater treatment and civic facilities.

With an array of top professionals provides comprehensive construction design, engineering and contracting activities. With a comprehensive professional skills and long experience we offer the following range of services:

  • Turnkey contracts (EPC)
  • Execution of project documentation for all stages (BI, BE, DE, SD)
  • Analyses and studies (impact of technological complexes on the environment; study the dispersion of pollutants in the air, noise studies, energy performance certificates, etc.).
  • Site facility – Construction management; technical and erection supervision
  • Commissioning, training of the operational stuff
  • Special activities and optimization of heating coke oven batteries and industrial ovens
References
  • The first stage of modernization of the quenching tower

    Category: Coke Location: Košice, Slovak Republic  Implementation: 2018   Description: HUTNÍ PROJEKT Frýdek-Místek a.s. completed the first stage of modernization of the quenching tower, in Kosice in Slovakia republic recently. The second stage will be realized during next year. The first stage consisted of the construction of a temporary quenching tower to modernize the old, inadequate quenching tower which…

  • Replacement of the collector mains

    Category: Coke Location: Košice, Slovak Republic  Implementation: 2018   Description: Next stage of the replacement of the collector mains on the large-volume coke oven battery block has been realized by reason of unsatisfactory condition of existing facilities. During the reconstruction, the collecting mains were replaced on one block of the battery. The project has been realized during the full…

  • Chemical plants – Trays of NaOH

    Category: Chemical plants Location: Ostrava Sponsor: BorsodChem MCHZ, s.r.o. Scope of work: turnkey project Building type/purpose: reconstruction Term: in progress Description: This is the dismantling of two pieces of existing containers and their disposal. The delivery includes the installation of new 4% NaOH H 1207 A, B solution onto the loose shafts.

  • Energy – Greening of boilers K12, K13, K14 of Třebovice Power Station

    Category: Energy Type of construction: New Installation Localization: Ostrava – Třebovice Client: NOEN, a.s Implementation: 2017 Description: For the energy industry, our company developed for Veolia Energie ČR, a.s. project documentation for the execution of the construction, including the execution of the function of the general designer for the complete project documentation for the project entitled “The…

  • Design and Construction of Coke Battery

    Category: Coke Location: VISAKHAPATNAM , India Implementation: in a progress Description: HPFM is  leading Consortium in the Design and Construction of Coke Chemicals for Coke Battery No. 5 at RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT. In accordance with the contract signed on October 14, 2017, HPFM completed basic engineering within eight months of signing the SoD. Currently…

  • Coke production – Replacement of collecting headers on coke oven battery with 7m height

    Category: Coke Location: Košice, Slovak Republic  Implementation: 2017 Description: The replacement of extraction headers including accessories has been realized by reason of unsatisfactory condition of existing facilities. COB block headers have been replaced during the construction time including pipeline system, wiring system, control system and standpipes re-walling. The project has been realized during full operation of neighbor…

  • Chemical plants – Lovochemie

    Category: Chemical plants Location: Lovosice Sponsor: Lovochemie, a.s. Type of construction: New Installation Purpose of construction: supplement Implementation: 11/2017 Description: It is the building of a new modern technological unit within the existing premises for the production of fertilizers and replacement of existing production units DA and UGL new ones. Project was implemented in the existing space…

  • Industrial buildings – New manufacturing plant for Medical Sets

    Category: Industrial Buildings Location: Havířov Type of construction: New Realization: 2017 Description: The construction of a “New manufacturing plant for Medical Sets” was statutory approved for the investor Mölnlycke Health Care ProcedurePak s.r.o., In May 2017. The operation is specialized on the production of disposable surgical Mölnlycke Procedure sets at the factory. Our company HUTNÍ PROJEKT Frýdek-Místek a.s. was…

  • Coke production – Control activities of Thermal division

    Category: Coke Location: Trinec Client: Trinecke Zelezarny a.s. Type of construction: Revamping and modernization Implementation: 2017 Description: Company HUTNI PROJEKT Frydek-Mistek a.s.  provides within this project activity thermal control for the construction and start-up activities associated with the COB no. 11.

  • Production of coke – Experimental coke oven

    Category: Coke Location: Třinec, Czech republic Tenderer: TŘINECKÉ ŽELEZÁRNY, a.s. Realization: 2017   Description: In the company TŘINECKÉ ŽELEZÁRNY a.s. a pilot coke oven, which was designed, delivered and commissioned by the general contractor of the HUTNÍ PROJEKT Frýdek-Místek a.s. The experimental coke oven is a device used to model the coal batch quality and the behavior…

News

Completion of the 1st stage of the modernization

HUTNÍ PROJEKT Frýdek-Místek a.s. completed the first stage of modernization of the quenching tower, in Kosice in Slovakia republic recently. The second stage will be realized during next year. The first stage consisted of the construction of a temporary quenching tower to modernize the old, inadequate quenching tower which does not meet the nowadays´ emission…

Details

New project

After successful tender stage, HUTNÍ PROJEKT Frýdek-Místek, a.s. has concluded Contract with ArcelorMittal Ostrava a.s. for a project „Deacidifier and Stripper at Coke plant“. Within the project there will be installed two new apparatuses (Deacidifier and Stripper). This is a replacement of existing apparatuses with a view to ensure the operation of existing equipment. There will…

Details

Completion of Basic Engineering

HPFM is leading Consortium in the Design and Construction of Coke Chemicals for Coke Battery No. 5 at RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT. In accordance with the contract signed on October 14, 2017, HPFM completed basic engineering within eight months of signing the contract. Currently the work on engineering details is being conducted…

Details

65TH ANNIVERSARY CELEBRATION

These days we are celebrating 65 successful years of joint-stock company HUTNÍ PROJEKT FRÝDEK – MÍSTEK a.s. with the realization of hundreds of industrial, transport, civil and energy buildings. The existence of this company in such a complex market is mainly the merit of all the employees who have gone through this company. Everyone contributed…

Details

HUTNÍ PROJEKT Frýdek-Místek Concluded Another Contract in India

On 14 October 2017, HUTNÍ PROJEKT Frýdek Místek a.s. signed a contract for the supply of chemical operations of the coking plant with Vishakhapatnam Steel Plant in India with the aim to expand the existing coke production by means of a coke oven battery No. 5 with a total annual production capacity of 7.3 million…

Details
Our business partners
Write us

Company name (required)

Your name (required)

Your email (required)

Your phone (required)

Your message