Category: Industrial Buildings
Location: Ostrava
Customer: ArcelorMittal Ostrava, Inc.
Type of construction: New Installation
Realization: 2014-2015
Description:
During the erection was the existing de-dusting system dismounted. They were built two new filtration plant including new chimneys, switching station, compressor station. There was installed new de-dusting duct for all the technological equipment and the cooling belts. New premises were built, including erection and commissioning of sorting and feeding gratings on sintering belts.