Já jsem textový blok. Klikni na tlačítko úprav ke změně textu. Výplňový text: Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

New chemical warehouse

Category: Industrial Buildings Location: Rožnov pod Radhoštěm Client: ON Semiconductor Czech Republic s.r.o. Implementation: 2023 Description: Our company handed over to the investor ON Semiconductor Czech Republic s.r.o. a feasibility study, the aim of which was to expand the storage capacity of chemicals to the spatial maximum in connection with the existing warehouse and with the…

Reconstruction of gas exhauster drives

Category: Energy Type of construction: Permanent construction Localization: Ostrava Client: OKK Koksovny a.s. Implementation: 2023 Description: Our company has completed a delivery to replace the existing ring electric motors of the TK1 and TK2 turbochargers with new asynchronous motors with start-up and speed controlled by frequency converters. This replacement resulted in energy savings in the coke oven gas…

KRAIC INSTALLATION

Category: Chemical plants Location: Radlin, Poland Sponsor: JSW KOKS SPÓŁKA AKCYJNA Term: 2022 Description: HUTNÍ PROJEKT Frýdek-Místek a.s. completed the Desulfurization project for JSW RADLIN, Poland. Amount of coke oven gas: 45,000 Nm3/h (including approx. 5,000 Nm3/h post-reaction gas from the catalytic decomposition of ammonia and Claus sulfur production. – “KRAiC”.

Reduction of Fugitive Emissions of Solid Polluting Substances on Departure Routes of the northern part of Sinter in AMO

Category: Industry Location: Ostrava Client: Liberty Ostrava a.s. Implementation: 2022 Description:  Our company successfully completed a turnkey delivery, the subject of which was the reduction of fugitive emissions of solid pollutants substances on the departure routes of northern part of Sinter Plant. Part of the project was the design of a new optimized exhaust duct network of existing de-dusting…

New Air Compressor

Category: Energy Type of construction: Permanent construction Localization: Ostrava Client: Liberty Ostrava a.s. Implementation: 2022 Description: HUTNÍ PROJEKT Frýdek-Místek a.s. the turnkey delivery of the “New Air Compressor” was completed for Liberty Ostrava a.s. Part of the delivery and installation of the required technology was the replacement of the existing steam air compressor with 3 new modern screw…

Modernization of the ammonium sulphate belt conveyer and centrifuge

Category: Coke Procuction Location: Ostrava Implementation: 2022 Description: For our investor, we have completed the Modernization of the Ammonium Sulphate belt conveyer and the centrifuge. The purpose of the construction was to modernize the ammonium sulfate conveyer belt consisting of  the replacement of the conveyor belt and the existing unsatisfactory Centrifuge. The compensation also covered the necessary pipeline…

Modernization of gas distribution for tubular oven

Category: Coke Procuction Location: Ostrava Implementation: 2021 Description: Our company successfully completed the delivery of the project “Modernization of gas distribution for tubular oven” for OKK Koksovny a.s.  The purpose of the project was to modernize the coke oven gas distribution in three stages for the purpose of heating of tubular ovens 31a and 31b intended for wash…

Replacement of Isothermal Nitration by Adia-batic one

Category: Chemical plants Location: Ostrava Sponsor: BorsodChem MCHZ, s.r.o.  Term: 2021   Popis: For our client M/s BorsedChem MCHZ, s.r.o. the company prepared the documentation for the large-range Project of “Replacing isothermal nitration with adiabatic”. After commissioning of adiabatic benzene nitration, where HUTNÍ PROJEKT Frýdek-Místek a.s. processed off-site serving to ensure higher production capacities for individual media,…

Experimental pilot coke oven, Dillingen

Category: Coke Procuction Location: Germany, Dillingen Implementation: 2022 Description: HUTNÍ PROJEKT Frýdek-Místek a.s. supplies and installs at the SHS SERVICES GmbH plant in Dillingen Saar, Germany the pilot oven. This  device is designed for process of testing 500kg of coal in pilot oven including coal preparation, coke quenching and coke stabilization. Parameters of pilot oven The coke production capacity…

Modernization of Quenching tower

Category: Coke Procuction Location: Slovak Republic Implementation: 2019   Description: HUTNÍ PROJEKT Frýdek-Místek a.s. has completed modernization of Quenching tower for large volume COB with annual capacity of 1 mil t coke.  The aim of the project was to reduce emissions of solids during coke quenching.  The modernization consisted in the installation of a secondary quenching – secondary…

Replacement of collecting mains of large volume COB

Category: Coke Procuction Location: Slovak Republic Implementation: 2019   Description: In the end of the year HUTNÍ PROJEKT Frýdek-Místek a.s. executed the replacement of collecting mains on last of three blocks of large volume COB with annual capacity 1 mil t coke. As a part of the works there were dismantled both old worn out collecting mains and…

Sole Heated Oven (SHO)

Category: Coke Procuction Location: Germany Client:ThyssenKrupp Steel Europe AG Implementation: 2019   Description: HUTNÍ PROJEKT Frýdek-Místek a.s. supplied and installed at the ThyssenKrupp Steel Europe AG plant in Duisburg the SHO test furnace for measuring of expansion of coking coals. The supplied SHO furnace is a result of the company’s own development and is manufactured in accordance with…